[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

help



Hi,

    Apology to all to mass mail everybody but I really need some help. I was
wondering for a typical  job shop problem (like the benchmark problem Muth
and Thompson 10x10 and 20x5), whether all makespan lengths are possible.
i.e. for 10x10, the shortest possible makespan I believe is 930 so is all
the make span greater that 930 possible? Say 931, 932, 933 and so on to
maybe 1300.
    Thank you






regards,
Allen